

WHY DCM?
DCM is the trusted solution for turning weak seabeds into stable foundations, here’s why.
Stronger Foundations
Transforms soft seabeds into solid, buildable ground.
Proven Performance
Track record in Asia’s largest reclamation projects.
Faster &
Smarter way
Reduces reclamation timelines while ensuring safety
Sustainable Impact
Minimizes dredging, protects marine ecosystems.
WHY DCM MATTERS
As coastal cities expand, weak seabeds pose one of the biggest challenges to safe and sustainable land reclamation. Deep Cement Mixing (DCM) solves this by strengthening the seabed in place, enabling airports, ports, and coastal infrastructure to rise where it once seemed impossible.
Here’s why it matters.
Watch how DCM is shaping the future of reclamation at Hong Kong International Airport.
Source: Hong Kong International Airport Authority
Disclaimer: Video courtesy of the Hong Kong International Airport Authority. KMC is not the producer of this video; it is shared here for educational purposes to illustrate DCM technology in action.
WHO ARE WE
KMC is a next-generation marine contractor focused on Deep Cement Mixing (DCM) — a technology transforming how coastal infrastructure is built. With our custom-engineered barges, regulatory expertise, and execution-ready team, we help reclaim land, reinforce coasts, and build lasting foundations below sea level.


1
Execution Excellence
We deliver high-precision marine works with safety, speed, and technical discipline.
2
Sustainable Marine Innovation
Our methods and vessels are designed to minimize environmental impact from seabed up.
3
Future-Ready Infrastructure
We build smarter marine infrastructure that meets tomorrow’s coastal demands.
WHAT
WE
STAND
FOR
Future-Ready
DCM Fleet
Our barges are purpose-built for the next generation of marine infrastructure. Equipped with advanced automation, compliance-ready systems, and eco-conscious technology, they set new standards in efficiency, safety, and sustainability.
See how KMC’s DCM fleet is the future of coastal development.
| Delivering Value Together

Why It Matters
Coastal Development Demands It
CONNECT WITH US!

KOREA MARINE CONSTRUCTION
Head Office:
SOUTH KOREA
#1004, 10F, 17 Daeryung Bldg, 25 Gasan Digital 1-ro, Geumcheon-gu, Seoul, 08594, Korea.
EMAIL:
CONTACT:
+82 2 3402 7171

KM CONSTRUCTION CO., LIMITED
Operations:
HONG KONG
1703, 17/F, Cheong Tai Commercial Building, Hong Kong SAR
EMAIL:
CONTACT:
+82 2 3402 7171






